Description: Supplying of materials tools plants and skilled and unskilled man power for repairing and maintenance of existing structure and fitting fixing all works with O and M during Shrawani Mela 2025 at Saheb Yadaw for the year 2025 26 Name of Work Supplying of materials tools plants and skilled and unskilled man power for repairing and maitenance of existing structure and fitting fixing all works with operation maintenance the entire works during Shrawani Mela 2025 at Saheb Yadaw for the year 2025 26 Group No SM 04
Details: WATER SUPPLY Cleaning of site, cutting bushes dressing and leveling do etc all complete as per direction of E/I Dismantling patent stone flooring including stacking serviceable materials in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. Providing 25 mm thick first class patent stone flooring (1:2:4) with stone chips,in two layers, bottom layer 19 mm thick (1:2:4) with 12 mm to 6 mm size graded stone chips and top layer 6 mm thick (1:2) with 6 mm down stone chips in panels,including cost of curing, finishing the surface smooth by rubbing with carborun-dum stone,taxes and royalty all complete as per building specification and direction of E/I. Providing and laying 6mm . precast white glazed tiles in walls over 12mm cement mortar (1:3) and jointed white grey cement slurry flush pointed with white cement including rubbing , polishing and cost of curing taxes and reality all completed as per building specificati
Sector: Water supply and Sewerage