Details: dismantling r.c.c. work including stacking serviceable materials in countable stacks within 15m. lead and disposal of unserviceable materials with all leads all complete as per direction of e/i.(5.10.3) dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15m. lead and disposal of unserviceable materials with all leads all complete as per direction of e/i.(5.10.1) earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item a) and disposal of excavated earth as obtained to a distance upto 50m including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of e/i.(5.1.1) extra for earthwork in hard soil as per specification and direction of e/i. ( vide classification of soil item-b)(5.1.2) filling in foundation trenches and plinth in layers. not exceeding 150 mm thick well watered, rammed
Sector: RDPR