Details: labour for cleaning the work site before and after work etc. dismantaling pucca brick or lime work including stacking serviceable materials in countable stacks within 15 m lead and disposal of unserviceable materials with all leads all complete as per direction of e/i earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-a) and disposal of excavated earth as obtained to a distance up to 50 m. including all lifts, levelling, ramming the foundation trenches removing roots of trees, shrubs all complete as per approved design, building specification and direction of e/i. stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve at quary supplying and laying (properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of e/i. providing and laying in
Sector: Urban Authority