Details: labour for cleaning the work site before and after work etc. dismantling of pcc work ……do….all complete as per specification and direction of e/i, earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item -a) and disposal of excavated earth as obtained to a distance upto 50 m including all lifts,levelling,ramming the foundation trenches,removing roots of trees,shrubs all complete as per approved design,building specification and direction of e/i. providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials ,labour, royalty and taxes all complete as per building specification and direction of e/i. by mix in place method (construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grad
Sector: Urban Authority