Details: centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete providing and laying c.c. pavement of mix m-25 with ready mixed concrete from batching plant. the ready mixed concrete shall be laid and finished with screed board , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of engineer-incharge. (the panel shuttering work shall be paid for separately). (note:- cement content considered in this item is @ 330 kg/ . excess/less cement used as per design mix is payable/ recoverable separately). providing and filling in position rubberized bitumen hot sealing compound for sealing of expansion joints in roads / pavements all complete as per direction of the engineer-in-charge. using grade 'a' sealing compound conforming to is: 1834 providing and applying tack coat using bitumen emulsion conforming to is:8887, using em
Sector: Police and Internal Security