Details: exacavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto 1000 metres. construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 for grading - i complete as per the direction of engineer-in-charge. construction of un-reinforced,dowel jointed ,plain cement concrete pavement over a prepared sub base with 43 grade cement @400kg/cumec ,coarse and fine aggregate confirming to is 383 ,maximum size of
Sector: RDPR