Details: labour for cleaning the work site before and after work etc. providing precast r.c.c. m-200 with nominal mix of (1:1.5:3) in slab of desired size with approved quality of stone chips and clean coarse sand of f.m. 2.5 to 3 including cost of curing ,shuttering ,carrying the slab manually to site and laying in position all complete (but excluding the cost of reinforcement )taxes and royalty all complete as per building specifications and direction of e/i. providing tor steel reinforcement of 8 mm dia bars as per approved design and drawing excluding carriage of rods (straight or in coils) to work site, cutting, bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of e/i. providing tor steel reinforcement of 8mm,10mm dia bars as per approved design and drawing excluding carriage of rods (straight or in coils) to work site ,cutting bending and binding with annealed wire with cost of w
Sector: Urban Authority