Details: laying and jointing pvc pipe. heading clearing grass and removal of rubish (clearing grass and removal of uo to a distance 50 metre outside the periphery of the are. by manual means excavation for road work in soil with hydraulic excavator including cutting and loading in tippers,trimming bottom and side slopes,in accordance with requirements of lines,grades and cross sections,and transporting to the embankment location within all lifts and lead upto 1000m. construction of sub-grade and earthen shoulders ( construction of sub-grade and earthen shoulders with approved materials obtained from borrow pits with all leads and lifts, transporting to the site, spreading, grading to the required and compacting to the requrement of table no. - 300-2). construction of granular sub-base by providing closed graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achiev
Sector: RDPR