Details: laying and jointing pvc pipe. heading earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item a) and disposal of excavated earth as obtained to a distance upto 50m including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of e/i.r.c.d. s.o.r. item no. 12.01(i)(b)(i) supply and laying properly as per design and drawing riprap with good quality of boulders duly packed including the cost of materials, royalty and all taxes etc. but excluding the cost of carriage all complete job as per specification and direction of e/i.common s.o.r. item no. 5.6.8 (6.8) plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.r.c.d. s.o.r. item no. 12.04 providing randam rubble stone masonry in cm (1:3) in f
Sector: RDPR