Details: clearing grass and removal of up to a distance of 30 m outside the periphery of the area as per technical specification clause 201. s.o.r. item no. 2.02 compacting original ground supporting subgrade (loosening of the ground upto a level of 500mm below the subgrade level , waterd , graded & compacted in layer to meet requirement of table 300-2for subgrade construction .(sor item no 3.20 case (i) case(i)) construction of sub grade & earthen shoulders with appoved material obtained from borrow pits with all lifts & leads, transporting to the site , sperading , grading to required and compacted to meet required to table 300.2) with 1000 m leadas as per technical specification. clause 303.1 (sor item no 3.18 (ii)) construction of granular sub base by providing well grade material , spreading in uniform layers with moter grade on prepared surface mixing by mix in place method with rotavator at omc , and compacting with smooth wheel roller to achieve the desired complete as per techn
Sector: Zilla Parishad