Details: labour for cleaning the work site before and after work etc. dismantling pucca brick masonary or lime work including stacking serviceable material in countable stacks within 15m lead and disposal of unserviceable materials with all leads complete as per direction of e/i dismentalling of rienforced cement concrete and……..do…….e/i. earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-a) and disposal of excavated earth as obtained to a distance up to 50 m. including all lifts, levelling, ramming the foundation trenches removing roots of trees, shrubs all complete as per approved design, building specification and direction of e/i. extra for earthwork in hard soil as per specification & direction of e/i.(vide classification of soil item-b) stone cushger dust finer than 3mm with not more than 10% passing of 0.075 sieve at quary. basic rate =300.00 add 15.95% (cp+o.h+w.c ) =347.85 supplying and laying (properly as per desig
Sector: Urban Authority