Details: execution of works -(as per cpwd specifications 2023 as well as approved by the competent authority .) dismantling steel work in single sections including dismembering and stacking within 50 metres lead in channels, angles, tees and flats with all complete. dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of engineer -in- charge in cement mortar with all complete. stone work in plain ashlar in super structure upto floor five level in cement mortar 1:6(1 cement: 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement:2 stone dust) with an admixture of pigment matching the stone shade red sand stone with all complete. demolishing cement concrete manually by mechanical means including disposal of material within 50 metres lead as per direction of engineer – in – charge nominal concrete 1:3
Sector: Museums