Details: earth work in excavation by mechanical means (hydraulic excavator)/ manual means in foundation trenches or drain (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, surplus excavated soils as directed, within a lead of 50 m. all kinds of soil filling available executed earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep disposal of , lead up to 50 m and up to 1.5 m. all kinds of soil supplying chemical emulsion in sealed containers including delivery as specified. chlorpyriphos/ lindance emulsifiable concentrate of 20% diluting and injecting chemical imulsion for post-constructional anti-termite treatment (excluding the cost of chemical emulsion): along the external wall below concrete
Sector: Medical Education