Details: cleaning of road all ………….complete earth work in excavation in foundation trench in ordinary soil (vide classification of soil item b) and disposal of excavated earth as obtained to a distance upto 50 m. including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, building specification and direction of e/i.(5.1.1) providing and laying factory made chamfered edge cement concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using pu mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate , filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per dir
Sector: Urban Authority