Details: dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15m. lead and disposal of unserviceable materials with all leads all complete as per direction of e/i. dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15m. lead and disposal of unserviceable materials with all leads all complete as per direction of e/i. dismantling r.c.c. work including stacking serviceable materials in countable stacks within 15m. lead and disposal of unserviceable materials with all leads all complete as per direction of e/i. earthwork in excavation in foundation trenches in ordinary soil ( vide classification of soil item -a) and disposal of excavated earth as obtained to a distance upto 50 m. including all lifts, levelling,ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, building specification and direction of ei i s.o.r item no -5.1.1 providin
Sector: Road development