Details: dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15m. lead and disposal of unserviceable materials with all leads all complete as per direction of e/i. taking out existing cc interlocking paver blocks from footpath/ central verge, including removal of etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of engineer-in-charge earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item a) and disposal of excavated earth as obtained to a distance upto 50m including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of e/i.extra for earthwork in hard soil as per specification and direction of e/i. ( vide classification of soil item-b) providing c
Sector: Urban Authority