Details: earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - a) and disposal of excavated earth a obtained to a distance up to 50m including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of e/i. earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - a) and disposal of excavated earth a obtained to a distance up to 50m including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of e/i. extra for earth work in hard soil as per specification and direction of e/i. (vide classfication of soil item - b) providing coarse clean sand in filling in foundation trenches or in plinth including thick with all leads and watering in layers not exceeding 150mm thick with all leads and l
Sector: RDPR