Details: shed-1 (near shiv mandir)earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-a) and disposal of excavated earth as obtained to a distance up to 50 m including all lifts levelling ramming the foundation trenches removing roots of trees shrubs all complete as per approved design, building specification and direction of e/i. extra for earthwork in hard soil as per. specification and direction of e/i (vide classification of soil item _b) filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 m and lift of 1.5m all complete as per building specification and direction of e/i (mode of measurement compacted volume) providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding
Sector: Zilla Parishad