Details: earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item a) …..do….do…..specification and direction of e/i.5.1.1 disposal of excavated earth in borrow area of lead 1km(k) +2km(p) ( add 50% extra for loose volume) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level (1:1.5:3) e/i. (5.3.1.1) providing course clean sand in filling in foundation tranches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building a specification and direction of e/i.[5.1.10] providing and laying factory made chamfered edge cement concrete paver blocks in footpath, parks,lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using pu mould, laid in required colour & pattern
Sector: Urban Authority