Details: clearing grass and removal of up to a distance of 50 meters outside the periohery of the area as per technical specification clause 201 . (rcd 2.02) excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m (rcd 3.06) compacting original ground supporting subgrade loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for sub-grade construction.(rcd 3.20 case i) construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2.(rcd 3.18-ii) construction of granular sub-base by providing close graded materia
Sector: Water Resource Department