Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. rcdsor 2.03(iii)a excavation for road way in soil by maechanical means including cutting and transporting the earth to site of embankment / dumping area with lead upto 1000 metres, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross section. by mix in place method (construction of granular sub-base by providing close graded material,spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at omc and compacting with vibratory power rolle
Sector: Road development