Details: earth work in excavation of foundation trenches in all kinds of soil and disposal of excavated earth so obtained (50m. away from the edge of the trenches) with initial lead of 150m and initial lift of 1.5m as per specification and direction of e/i.s.o.r. item no. 6.1.8 + 6.1.9 wrd i) ordinary soil (excavation upto 3.0m depth)60% ii) ordinary rock (not requiring blasting)40% plain/reinforced cement concrete in open foundation complete as per drawing and technical specifications pcc grade m15 providing random rubble stone masonry in cement mortar (1:4) in foundation and plinth with hammer dressed stone of less than 0.03 m3 in volume and clean coarse sand of f.m 2 to 2.5 including cost of screening, raking out joints to 20 mm depth, curing,taxes and royalty all complete job as per specification and direction of e/i.4.28 common [5.2.28 bcd 2018] providing random rubble stone masonry in cement mortar (1:4) in superstructure with hammer dressed stone of less than 0.03 m3 in volume and cle
Sector: RDPR