Details: jungle clearance in borrow area, building premises, flanks and slopes of the roads, cannals and embakment by removing the grass and the jungle bushes from the top including weeding out shurbs and small trees upto 150mm. dia and their removal as per specification and direction of e/i. (s/r item no. 5.1.3.1)common e/w in excavation of foundation trenches in ordinary soil (vide classification of soil item a) and disposal of excavated earth so obtained to a distance up to 50m and average lift of 1.5m including levelling ramming the foundation trenches removing the roots or shrubs etc.all complete as per specification and direction of e/i (s/r item no. 7.1.27)wrd part b earth work in bed clearance of desilting of canal carrying f.s. discharge between 8.5 cumecs (300 cusecs) and 0.14 ciumecs(5 cusecs) and renovation of pynes etc. disposal of excavated earth etc. in ordinary soil including rough dressin with initial lead of 10 m and lift of 1.5m as per specification and direction of e/i.
Sector: Water Resource Department