Details: jungle clearance including weeding out shrubs and small trees upto 150 mm dia (grith) and their removal as per specification and direction of e/i. earthwork in excavation in foundation trenches in hard soil (vide classification of soil item-b) and disposal of excavated earth as obtained to a distance up to 50 m. including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of e/l. construction of granular sub base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc and compacting with smooth wheel roller to achive the desired density, complete as per technical specification clause 401 for gradimg iii materials providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:1½:3 (1 cement:
Sector: RDPR