Details: excavation for road way in soil by mechanical means including cutting and transporting the earth to site of embankment / dumping area with lead upto 1000 metres, including trimming bottom and side slopes in accordance with requirements oflines, grades and cross sections as per sepecification and direction of e/i (sor rcd 3.03) loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for sub-grade construction as per sepecification and direction of e/i (sor rcd 3.20 case-i) construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. as per sepecification and direction of e/i . ( sor rcd 3.18) construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mi
Sector: Water Resource Department