Details: excavation for structures in ordinary soil (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) mechanical means depth upto 3m back filling behind abutment, wing wall and return wall complete as per drawing and technical specification providing steel liner 10mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing bored cast-in-situ m35 grade rcc pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000m. (pile diameter 1200mm) levelling course for pile cap (pcc m15) cement concrete for reinforced concrete in pile cap complete as per drawing and technical specification (rcc grade m25, using concrete mixer) pcc m-15 grad
Sector: RDPR