Details: site clerance prov. granular sub base as stone dust filling in road embank … providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:1.5:3 (1 cement : 1.5coarce sand (zone-iii): 3 grade stone aggregate 20 mm nominal size) centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete earth filling in foundation trenches and plinth inlayer not exceeding 150mm thick will wateredrammed fully compacted and fine dressed withearth obtained from excavation of foundationtrenched with a lead of 50mm and lift of 1.5m allcomplete as per building specification anddirectionof e/i. (mode ofmeasurement compacted volum add carriage cost of materials i) cement lead from 05 km ii) sand lead from 50 km ii) chips lead from 12 km iv) stone dust from 12 km add cost of s/b and photography add 18 % gst add 1 % labour cess
Sector: Labour and Employment