Details: clearing and grubbing road land including uprooting rank vegetation,grass,bushe,shrubs,saplings and trees girth upto 300 mm by manual means upto lead of 1000 m in area of light jungle .(jh sor july 2022) clearing and grubbing road land including uprooting rank vegetation,grass,bushe,shrubs,saplings and trees girth upto 300 mm by manual means upto lead of 1000 m in area of thorny jungle .(jh sor july 2022) supplying and laying gravel filter (size 5mm to 15mm) in of the dam as per design drawing including the cost of material royalty and all taxes etc. but excluding the cost of carriage all complete as per specification and direction of e/i.(common part a /jh sor 2022/page 209/5.6.6) supplying and laying sand filter on of the dam as per design drawing including the cost of material royalty and all taxes etc. but excluding the cost of carriage all complete as per specification and direction of e/i.(common part a /jh sor 2022/page 209/5.6.5) labor charge for taking out disturbed boulde
Sector: Water Resource Department