Details: (1) civil workearthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-a) and disposal of excavated earth as obtained to a distance upto 50 m. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of e/l.extra for earthwork in hard soil as per specification and direction of e/l (5.1.1) earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-a) and disposal of excavated earth as obtained to a distance upto 50 m. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of e/l.extra for earthwork in hard soil as per specification and direction of e/l (vide classification of soil item-b) (5.1.2) filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well wate
Sector: Zilla Parishad