Details: clearing grass and removal of up to a distance of 30 m outside the periphery of the area as per technical specification clause 201 compacting original ground supporting subgrade (loosening of the ground upto a level of500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.) construction of subgrade and earthen shoulders (construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet requirement of table no. 300-2) construction of embankment with material deposited from roadway cutting (construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2)rolling with smooth wheeled roller granular sub-base with coarse graded material ( tabl
Sector: RDPR