Details: labour required for site clearence ,cutting levelling and dressing all comp providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts . all complete as per building specification and direction of e/i (mode of measurement compacted volume) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering m10(1:3:6) all complete as per specification and direction of engineer-in-charge' providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering m20(1:1.5:3) all complete as per specification and direction of engineer-in-charge' providing centering and shuttering including strutting,propping etc and removal of form for foundation do-do-e/i filling in foundation both side of road embankment . (flank filling) add carriage of material(a)sand(avg lead 20 km) (b)s/chips(avg lead 18
Sector: Zilla Parishad