Details: section i building work earth work in excavation in foundation trenches in ordinary soil(vide classification of soil item a) and disposal of excavated earth as obtained to a distance upto 50m including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of e/i. earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge hard rock (blasting prohibited) filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 m and lift of 1.5 m all complete as per building specification and direction of e/i. (mode o
Sector: Police and Internal Security