Details: earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item -b) and disposal of excavated earth as obtained to a distance upto 50 m including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and extra for earth work in hard soil as per specification & direction of engineer in charge (vide classification of soil item b) earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5m all complete as per building specification and direction of e/i. (mode of measurement compacted volume). providing coarse clean local sand in filling in foundation trenches or in plinth including ramming and watering in layer not exceeding
Sector: RDPR