Details: excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m s.o.r item no. 3.06 compacting original ground supporting subgrade (loosening of the ground a level of 500 mm below the sub-grade level , watered,graded and compacted in layers to meet requirement of table 300-2 for subgrade construction)s.o.r item no. 3.20 case- i construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet requirement of table no. 300-2. s.o.r item no. 3.18 (ii) construction of granular sub- base ( for grading -i material) by providing close graded material, spreading in uniform layers with motor graded on prepared surf
Sector: Rural development