Details: clearing grass and removal of up to a distance of 50 metres outside the periphery of the area by manual means clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. by manual means:- in area of light jungle excavation in soil using hydraulic excavator and tippers with disposal upto 1000 metres. excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m construction of embankment with material deposited from roadway cutting. construction of
Sector: RDPR