Details: excavation in soil using hydraulic excavator ck 90 and tippers with disposal upto 1000 metres. (excavation for roadwork in soil with hydraulic excavator of0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m) plant mix method (construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at omc, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to archieve the desired density, complete as per clause 401) for grading -i material. prime coat (providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.) bituminous macadam
Sector: Urban Authority