Details: clearing grass and removal of up to a distance of 50 meters outside the periohery of the area as per technical specification clause 201 .by manual means (rcd 2.02) excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m.(rcd 3.06) loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for sub-grade construction.(rcd 3.20 case i) construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at omc, and compacting with vibratory roller to achieve the desired density, complete as per clause 401(for grading i material.) (rcd 4.01b(i)) construct
Sector: Water Resource Department