Details: clearing grass and removal of up to a distance of 30 meters outside the periohery of the area as per technical specification clause 201 . construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet requirement of table no. 300-2. compacting original ground supporting subgrade (loosening of the ground a level of 500 mm below the sub-grade level , watered, graded and compacted in layers to meet requirement of table 300-2for subgrade construction) excavation in soil using hydraulic excavator ck 90 and tippers with disposal upto 1000 m (excavation for road work in soil with hydraulic excavator including cutting and loading in tippers , trimming bottom and side slopes in according with requirements of lines , grades, and cross section and transporting to the embankment location within all lifts and lead upto 1000 m) construction of embankment with mat
Sector: RDPR