Description: RDD SD CHATRA 07 2024 25 RE 1 CONSTRUCTION OF HL BRIDGE OVER NILANJAN RIVER KOBNA SCHOOL TO SOVADAG ROAD UNDER HUNTERGANJ BLOCK OF CHATRA DISTRICT Name of Work CONSTRUCTION OF HL BRIDGE OVER NILANJAN RIVER KOBANA SCHOOL TO SOVADAG ROAD UNDER HANTARGANJ BLOCK OF CHATRA DISTRICT
Details: BRIDGE PARTEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soilDepth upto 3m Excavation for structures in ordinary Rock not requiring blasting (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification PCC 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foudation and compacted by vibration including curing for 14 days.
Sector: RDPR