Details: excavation in soil by manual meansexcavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto 1000 meters. providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including' cost of all materials, labour, royalty and taxes all complete as per building specification and direction of e/l (mode of measurement complacted volume). supplying and laying (properly as per design and drawing) rip-rap with good quality of boulder duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of e/i. plain/reinforced cement concrete in open foundation complete as per drawing and technical specification of e/i. centering and shuttering includin
Sector: RDPR