Details: clearing grass and removal of up to a distance of 50 m outside the periphery of the area as per technical specification clause 201s.o.r. item no. 2.02 clearing and grubbing road land (clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)s.o.r. item no. 2.3 (ii) a compacting original ground supporting subgrade (loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for sub-grade construction.)sor item no. 3.20 case-1 construction of subgrade and earthen shoulders (construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all
Sector: RDPR