Details: (strengthening of road from dasmile alipur more to bumru via saheda (length-2.10 km.)) scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres. by mechanaical means using motor grader dismantling of structures dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres dismantling prestressed/ reinforced cement concrete grade m-20 & above clearing grass and removal of up to a distance of 50 metres outside the periphery of the area by manual means clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut ear
Sector: RDPR