Details: earthwork in excavation of foundation trenches in ordinary in soil (vide classification od soil item -a) and disposal of excavated earth as obtained to a distance upto 50m including all lift, leveling ramming the foundation trenches, removing roots of tree shurbs all complete as per approved design, building specification and direction of e/i. (5.1.1.) earthwork in excavation of foundation trenches in ordinary in soil (vide classification od soil item -a) and disposal of excavated earth as obtained to a distance upto 50m including all lift, leveling ramming the foundation trenches, removing roots of tree shurbs all complete as per approved design, building specification and direction of e/i. (5.1.1. + 5.1.2.) earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5m all complete as per building specification and di
Sector: Water Resource Department