Details: earthwork in excavation of foundation trenches in ordinary in soil (vide classification od soil item -a) and disposal of excavated earth as obtained to a distance upto 50m including all lift, leveling ramming the foundation trenches, removing roots of tree shurbs all complete as per approved design, building specification and direction of e/i. (5.1.1. + 5.1.2.) earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5m all complete as per building specification and direction of e/i. (mode of measurement compacted volume). (5.1.7.) providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of e/l.
Sector: Water Resource Department