Details: model-1b with sourceconstruction of 3 mtr. dia x 5 mtr depth spring well supplying all labours & equipment for digging well in hard soil vide classification of soil item-b including disposal of excavated material up to 50 m lead including dressing the side etc. all complete as per specifiation an direction of e/i. suplying all labour & equipment for digging well in soft rock vide classification of soil item-c with chisel and hammer including disposing of excavated materials and stacking of spoils to a safe distance of 50 m all complete as per specification and direction of e/i. (a) 1.00 m to 3.00 m deth below g.l (b) 3.00 m to 4.00 m deth below g.l. (c) 4.00 m to 5.00 m deth below g.l. suplying all materials labour & equipment for roviding r.c.c. ( 1:2:4) in well curb including centering and shuttering but excluding the cost of reinforcement all complete job as per specification and direction of e/i. supplying all materials and labours for providing rough dressed stone masonary
Sector: Water supply and Sewerage