Details: compacting original ground (loosening, levelling and compacting original ground supporting embankment to facilitate placement of first layer of embankment , scarified to a depth of 150 mm , mixed with water at omc and then compacted by rolling so as to achieve minimum dry density as given in tables 300.2 for embankment construction. construction of sub grade & earthen shoulder ( construction of subgrade and earthen shoulders with approved material obtained form borrow pits with all lift & leads , transporting to site, spreading, grading to required and compacted to meet requirement of table no. 300-2) granular sub base with close graded material (table:- 400-1) by mix in place method ( construction of granular sub-base by providing well graded material, spreading in uniform layers with moter grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with sooth wheeel roller to achieve the desired density, complete as per clause 401) (ii) for gr
Sector: Zilla Parishad