Details: e/w in excavation of foundation tranches as per designed section in all kinds of soil, including moorum soil, soil mixed with kankar pebbles and boulders upto 300mm size and disposal of the same (beyond 50m away from the toe of dam in th country side ) within initial of 150 m and initial lift of 1.5m. all lifts as per specification and direction of e/i. (sr. item no. - 5.1.14.1 ) e/w in excavation of foundation trenches of toe wall , spillway , head regulator intake well and outlet etc. as per design section in ordinary or soft rock (where blasting is not needed) ( vide classification of soil item-c) with disposal of soil ( beyond 50 m from the edge of trenches) with initial lead of 150 m and lift of 1.5 m as per specification and direction of e/i (sr. no. - 5.1.15.2) extra for wet earth - 5% of total qty.(sr. no. 7.1.22) hire charge of diesel operated 10hp pump for b ailing out water from foundation trenches where necessary including cost of fuel, pay of operator with depreciat
Sector: Water Resource Department