Description: Construction of Road from Role PMGSY Road to PMGSY Nawdiha Road via Bhagat Muhalla Haraiya Kala L 1 550 Km Name of Work Construction of Road from Role PMGSY Road to PMGSY Nawdiha Road via Bhagat Muhalla Haraiya Kala L 1 550 Km
Details: Clearing grass and removal of up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201 Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately)Bituminous Courses by Mechanical Means Compacting original ground supporting subgrade (Loosening of the ground upto a level of500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.) Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet requirement of table No. 300-2) Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited
Sector: RDPR