Details: e/w in excavation in foundation trenches in ordinary soil ( vide classification of soil item – a ) and disposal of excavated earth clearance as obtined to a distebce up to 50 m including all lifts with leveling, ramming the foundation trenches removing roots of trees shrubs all complete as per approved design, building specification and direction of e/i. ( 5.1.1 + 5.1.2) providing coarse clean sand in filling in foundation trenches or in plinth including removing and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of e/i.(mode of measurement compacted volume). (5.1.10) providing designation 75- b, brick flat soling joints filled with local sand including cost of watering, taxes and royalty all complete as per building specification and direction of e/i. (5.6.3) providing and laying in
Sector: Zilla Parishad