Details: clearing grass and removal of up to a distance of 30 m outside the periphery of the area as per technical specification clause 201 dismantling of flexible pavements (dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately)bituminous courses by mechanical means compacting original ground supporting subgrade (loosening of the ground upto a level of500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.) construction of subgrade and earthen shoulders (construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet requirement of table no. 300-2) excavation in soil using hydraulic excavator ck 90 and tippers with disposal upto 1000 metres. (excavation for roadwork in soil with
Sector: RDPR